2014 | 178 | 35-45
Article title

Projektowanie realizacji obiektów budowlanych w warunkach ryzyka

Content
Title variants
EN
Considering Risk in Project Scheduling
Languages of publication
PL
Abstracts
EN
Scheduling projects of linear or repetitive character (roads, pipelines, high-rise buildings) involves harmonizing a number of continuous construction processes to be conducted by specialized crews or machine sets executed at the same time in a number of work sections. Such projects are often modeled by time-distance diagrams that are represented graphically as an X-Y plot where one axis represents location, and the other time. Project planning involves allowing for construction-specific risks and is aimed at providing reliable schedules. These are to help the manager to assure that the project is completed by the predefined due date and, at the same time, that interruptions in work flow are avoided. In the case of repetitive processes, schedule robustness can be improved by providing time buffers between consecutive activities. The paper proposes an analytic method of sizing these buffers that assumes (as in PERT) that activity durations are stochastic variables whose distribution parameters can be defined on the basis of optimistic, pessimistic and most likely estimates. The method was used to construct a casestudy schedule, and the schedule quality was tested by means of simulation.
Keywords
Year
Volume
178
Pages
35-45
Physical description
Contributors
References
  • Biruk S., Jaśkowski P., 2010: Harmonogramowanie przedsięwzięć wieloobiektowych z ciągłą realizacją procesów na działkach roboczych. "Zeszyty Naukowe Wyższej Szkoły Oficerskiej Wojsk Lądowych im. gen. T. Kościuszki we Wrocławiu", Rocznik XLII, 3(157), lipiec-wrzesień.
  • Davis R., 2008: Teaching Project Simulation in Excel Using PERT-Beta Distributions. "INFORMS Transactions on Education" 2008, Vol. 8(3).
  • Dyżewski A., 1965: Technologia i organizacja budowy. Arkady, Warszawa.
  • Harris R.B., Ioannou P.G., 1998: Scheduling Project with Repeating Activities. "Journal of Construction Engineering and Management", Vol. 124 (4).
  • Hejducki Z., 2000: Sprzężenia czasowe w metodach organizacji złożonych procesów budowlanych. Prace Naukowe Instytutu Budownictwa Politechniki Wrocławskiej, Monografie nr 34, Wrocław.
  • Jaworski K.M., 1999: Metodologia projektowania realizacji budowy. Wydawnictwo Naukowe PWN, Warszawa.
  • Jaśkowski P., Biruk S., 2005: Analiza algorytmów minimalizacji przestoju brygad roboczych przy ciągłej realizacji obiektów budowlanych. "Przegląd Budowlany", nr 11.
  • Jaśkowski P., Biruk S., 2011: The Method for Improving Stability of Construction Project Schedules through Buffer Allocation. "Technological and Economic Development of Economy", Vol. 17, No. 3.
  • Kapliński O., 1974: Niektóre problemy metody pracy równomiernej w warunkach stochastycznych. Materiały XX Jubileuszowej Konferencji Naukowej KILiW PAN i KN PZITB, Kraków-Krynica.
  • Marcinkowski R., 1990: Harmonogramowanie zadań inżynieryjno-budowlanych według wybranych kryteriów decyzyjnych. WAT, Warszawa (praca doktorska).
  • Marcinkowski R., 2002: Metody rozdziału zasobów realizatora w działalności inżynieryjno- budowlanej. WAT, Warszawa.
  • Mrozowicz J., 1997: Metody organizacji procesów budowlanych uwzględniające sprzężenia czasowe. Dolnośląskie Wydawnictwo Edukacyjne, Wrocław.
  • Orłowski Z., 1997: Harmonogramowanie realizacji robót remontowych metodą programowania dynamicznego. Materiały Międzynarodowej Konferencji Naukowej z cyklu: Mieszkanie XXI wieku, Białystok 8-10 V.
  • Rowiński L., 1982: Organizacja produkcji budowlanej. Arkady, Warszawa.
Document Type
Publication order reference
Identifiers
ISSN
2083-8611
YADDA identifier
bwmeta1.element.desklight-1b5296c0-9d01-4fa9-be9a-ded98f736bd3
JavaScript is turned off in your web browser. Turn it on to take full advantage of this site, then refresh the page.