Title variants
Languages of publication
Abstracts
This article discusses the reason for the suspension of railway traffic on the Jelenia Góra - Karpacz route. The possibility of reactivating the transport on this route was indicated. Based on the equation of the train movement, calculations of the theoretical travel were carried out, as a result of which the technical and total travel time were determined. A rational interval of train runs was determined and a timetable was proposed, taking into account relations going beyond Jelenia Góra. The article justifies the need to introduce supplementary connection operated by electric buses. The concept of reactivating traffic in this area should be supplemented with the construction of a P + R car park. The possibility of further development of the transport system in the discussed area was also proposed.
Journal
Year
Volume
Pages
83-94
Physical description
Contributors
author
- Politechnika Wrocławska
References
Document Type
Publication order reference
Identifiers
YADDA identifier
bwmeta1.element.mhp-7bceecfe-3eaa-4355-b9c5-ad12deabef10